PRIOR TO BEGINNING ANY WORK, TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. (646) 892-1388/1389 The concrete base must be restored at the same grade as the existing base; at no time may it be brought up to the asphalt course unless authorized by NYC DOT. Street Works Manual Customer Service: (718) 816-2300, The Bronx Following are the steps for permit application, review and issuance at the central Permit Office: Applications for all other construction-related work, including work on critical streets in Staten Island, can be submitted to the borough office in the borough in which the work is to be performed. See Section 3.5.1 Holds for more information. A $35 filing fee is required for all vault applications. RED LIGHT CAMERA CONDUIT IS LOCATED IN YOUR PROPOSED WORK AREA. Clicking on the "i" button at the top center of the map will change the cursor into an arrow with an "i" next to it. Chapter 2 describes processes and tools to enhance advance planning and coordination of street work between NYC DOT's own capital resurfacing and reconstruction programs and the street infrastructure work of other stakeholders, especially those that perform a large number of street excavations. RESTORATION OF ROADWAY WHICH HAS RED COLORED BUS LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF TERACOTTA #103856 RIDE-A-WAY COATING MATER'L MFG'D BY INTERGRATED PAVING CONCEPTS INC OR EQUIVALENT. The following section provides information on some issues that may delay the issuance of a permit or that may lead to the revocation of a permit. Appendix ACommon Permit Types and Documents Needed, Appendix DOther Agency and Utility Contact Information, DOB BUILDER'S PAVEMENT PLAN (BPP) AUTHORIZATION FORM, (Initial submission only) Borough Hall, 2nd Floor THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. NYC Parks & Recreation "Backfill" refers to the bottom layer of the restoration. 233 Schermerhorn Street, 11th Floor There is one permit application form that covers Street Opening, Building Operations/Construction Activity, and Sidewalk Construction permits for non-governmental work. To request release of a DOF hold, the permittee must contact Finance and either make a payment or agree to a payment schedule for all fees associated with the outstanding summonses/NOVs. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. HIQA also releases many holds. If this is not possible, sketches or drawings must be submitted, in duplicate, showing the proposed method of treatment to NYC DOT for approval. Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). The applicant must obtain CGL insurance policies written by companies that may lawfully issue such policies, with an A.M. Best rating of at least A-VII or a Standard & Poor's rating of at least AA. This form cannot be used if the permit has already expired. WORK ALLOWED 8 PM TO 6 AM NIGHTLY. This chapter describes the different types of permits that are issued by the New York City Department of Transportation (NYC DOT), the one-time permittee registration process, the application procedure for each permit type, and special circumstances and procedures. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. Copies of incorporation papers, licenses, and business certificate or filing receipt filed with the state of New York. POSTING OF SIGNS ON MTA/NYCT ANTENNA POLES IS PROHIBITED. THIS STIP IS USED FOR WORK THAT FALLS BETWEEN LANES AND REQUIRES THE CONTRACTOR TO RESTORE THE ROADWAY FROM 1' PAST THEIR RESTORATION TO THE NEAREST CURB FOR THE LENGTH OF THEIR WORK. New York City Department of Transportation Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas Sidewalks in low-rise residential areas should be at least 5 feet wide Wherever possible, sidewalk cross-slope should not be greater than 2% A HIQA inspector must be present during the restoration. A separate permit is required for each construction-related activity, except where otherwise provided in the Highway Rules or by permit stipulations. MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 9 AM TO 2 PM AND 3:30 PM TO 6 PM MON. The Third Edition of the Street Design Manual renews the Manuals status as a living document and reinforces its role as a critical resource for those working on projects in New York Citys public right-of-way. NYC DOT has a separate procedure for obtaining permits for emergency street opening/excavation work so that applicants can expeditiously obtain such permits. 8:30 AM to 4:30 PM, Brooklyn PERMITTEE MUST PROTECT DEP GREEN INFRASTRUCTURE DOWNSTREAM OF THE WORK OR WITHIN 5FT OF THE WORK AREA. DOT's preference is that there is no split in Pedestrian Flow. AS COORDINATED WITH COMMUNITY BOARD, CON ED. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. THIS STIP IS USED FOR WORK IN A TRAVEL LANE. The second permit for canopy maintenance is automatically placed on a. The permittee must attach a copy of the original permit to the application when it is submitted for renewal and all applicable reviews and fees will apply. Fax: (718) 298-7075, Staten Island (part-time office) CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE REPLACING COBBLESTONES SO HIQA CAN MONITOR THE REPLACEMENT. Chapter 4 describes the processes for executing work in the streets, after permits and approvals are obtained, and the enforcement actions NYC DOT may take to safeguard city streets. Fax: (718) 965-7753 Once OCMC executive staff determines the final permit stipulations, the permit will be released. See Chapter 3Permits and Approvals for more information. Cobra Head fixture on standard lamppost This chapter, which constitutes the current DOT Street Lighting Catalogue, outlines options for street and pedestrian lighting for New York City streets, bikeways, pedestrian bridges, pedestrian malls, plazas, and parks. Office hours: 8:30 AM - 4:30 PM, The Bronx WORK CROSSING THE ROADWAY CAN NOT EXTEND MORE THAN 11 FEET AT A TIME. WORK SOUTHBOUND 9AM-6PM M-F AND 9AM-6PM SAT/SUN. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Canopy design and construction must be in accordance with NYC DOT Standard Details of Construction. OFFICE. NO EXCAVATION OR NOISY OPERATION PERMITTED DURING THIS TIME PERIOD. WORK INCLUDES: CURB/SIDEWALK REPAIR AS NEEDED; ROADWAY MILLING/REPAIR AND RESURFACING; REMOVAL OF CENTER MEDIAN; RESETTING UTILITY OPENING; REMOVAL/REINSTALLATION OF TRAFFIC SIGNALS INCLUDING CONDUIT; INSTALLATION OF PAVEMENT MARKINGS AND PARKING SIGNAGE. The Guarantee Period is considered to be three years on unprotected streets, and up to five years, but at no time less than three years, on protected (recently resurfaced or reconstructed) streets commencing on the restoration completion date. No attachments of any kind are permitted on a canopy, including, but not limited to temporary or permanent signs, balloons, streamers, flags, banners or pennants. Fax: 212-720-3488, Queens PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE BENCH. Emergency utility access cover openings and emergency street openings/excavations, Permittee telephone number in case of complaints, Contractor's telephone number, if different from the permittee, The permit number under which the work is being performed, The purpose of the street opening/excavation, The start and scheduled completion dates of the work. POSITIONING OF TRAFFIC SIGNS (TOTAL OF . Brooklyn, NY 11211 4.0 Executing Work in the Street - Streetworksmanual.nyc VMS BOARD MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. Concrete (CON) hold All permits issued to work on concrete portions of the roadway are automatically placed on hold until a HIQA inspector performs an inspection of the work site to establish existing conditions before work begins. Where certification is unobtainable from the manufacturer, certification by the installer may be submitted instead. Long Island City, NY 11101 WORK 8 AM TO 7 PM MONDAY TO FRIDAY. THIS PERMIT INCLUDES AUTHORIZATION FOR THE STORAGE OF EQUIPMENT (OTHER THAN CRANES) AND MATERIALS ON THE JOB SITE ONLY, INCLUDING JERSEY BARRIERS IF APPLICABLE. For Holds: (718) 222-7231 ALL OVERDIMENSIONAL CRANE/TRAILERS REQUIRE AN ADDITIONAL PERMIT FROM THE NEW YORK CITY DEPARTMENT OF TRANSPORTATION DIVISION OF BRIDGES. To release an FCR hold, the applicant must demonstrate that either he or she has begun the CRIA process or that the CRIA statement is not required. AND THAT THE PREVAILING SCALE OF UNION WAGES SHALL BE THE PREVAILING WAGE FOR SIMILAR TITLES AS ESTABLISHED BY THE FISCAL OFFICER PURSUANT TO SEC. Real-Time Traffic Conditions & Cameras. Bronx.Forestry@parks.nyc.gov WORK 7 PM FRIDAY TO 6 AM MONDAY AND 7 PM-6 AM WEEKNIGHTS. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR RESTORATION OF CUT CONFINED TO WITHIN 8 FEET OF THE CURB LINE IN ACCORDANCE WITH NYCDOT RULES AND REGULATIONS FOR PROTECTED STREETS. 1150 Clove Rd. At crossings, the height of Accessible Pedestrian Signals must be reachable by a person using a mobility device, at a preferred height of 42 inches and a maximum height of 48 inches (see 2010 ADA Standards for Accessible Design). If any proposed work is within 100 feet of a bridge or structure, applicants must submit a scaled drawing showing the work and exact location. PERMITTEE IS REQUIRED TO CALL NYCDOT HIQA OFFICE AT 212-839-2430 TO SCHEDULE THEIR RE-DIG. CLOSURE GRANTED AT REQUEST OF SCA LETTER. Abuilding vault, as described in Section 2-13 of the Highway Rules, is any opening below the surface of the street that projects outside of the property line and is covered over, except for those openings: (1) used exclusively to access, by means of steps, the cellar or basement of any building; (2) used primarily for light and ventilation; (3) constructed or maintained by utility companies (including transformer vaults); and (4) which are subways, railroads and related structures. FIXED SIGN MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. Asingle PDF of the 619 Standard Sheets is available attheOfficial Electronic Standard Specifications and Standard Sheets website.